Master Planning
-
The Father’s House – Vacaville Campus
-
True North Church – Mullica Hill Campus
-
Peoples Church
-
NewSpring Church – Eastlan Campus
-
Concord Baptist Church
Equip Studio began working with Concord Baptist Church in 2018 to develop a long-term masterplan for their Anderson, SC campus. We were presented with several design problems that required a comprehensive assessment of how the sprawling campus was being utilized which resulted in a multi-staged solution that ultimately sets the stage for a "complete" masterplan for their property.
-
Florence City Center Market
The Florence City Center Market was designed with the City of Florence to bring a new energy and draw to an up and coming side of downtown. The market was built atop an existing warehouse pad leaving a portion of the existing building structure intact creating a unique and eclectic outdoor structure.
-
Athens Church – Green Space Project
Athens Church has always focused primarily on serving families within the community of Athens, GA.
-
National Community Church
National Community Church, led by Pastor Mark Batterson, partnered with Equip Studio to develop a design that conveyed their story as well as the story of our nation’s capital.
-
Netcast Church
Netcast Church, located near Boston, MA, decided to pursue a nontraditional route in regards to establishing their permanent church home.
-
Hope Point Church
Hope Point Church had been meeting as a mobile congregation in a local school for roughly 15 years in Spartanburg, SC. In order to provide ministry outreach to an under served community, the church acquired a former car dealership on Asheville Highway to convert into their new permanent church home.