Showcased
Level 2 – Prominent placements
-
Port City Community Church – Leland Campus
-
The Father’s House – Vacaville Campus
-
Parkside Pediatrics – Greer
-
True North Church – Mullica Hill Campus
-
Concord Baptist Church
Equip Studio began working with Concord Baptist Church in 2018 to develop a long-term masterplan for their Anderson, SC campus. We were presented with several design problems that required a comprehensive assessment of how the sprawling campus was being utilized which resulted in a multi-staged solution that ultimately sets the stage for a "complete" masterplan for their property.
-
Reverb Church – World Golf Village
Reverb Church in St. Augustine, FL is dedicated to exploring community outreach opportunities and was in need of a facility that would be open throughout the week to serve as a hub for the people around them.
-
Athens Church – Green Space Project
Athens Church has always focused primarily on serving families within the community of Athens, GA.
-
National Community Church
National Community Church, led by Pastor Mark Batterson, partnered with Equip Studio to develop a design that conveyed their story as well as the story of our nation’s capital.
-
Hope Point Church
Hope Point Church had been meeting as a mobile congregation in a local school for roughly 15 years in Spartanburg, SC. In order to provide ministry outreach to an under served community, the church acquired a former car dealership on Asheville Highway to convert into their new permanent church home.
-
ChurchLV – Seven Hills Campus
Adaptive Reuse, Churches, Interior Design, Master Planning, Renovation, Showcased, Under ConstructionSince 2004, ChurchLV has reached thousands of people from various backgrounds. Due to rapid growth and the vision to reach more people, ChurchLV acquired a 90,000 square foot K-Mart building on Sunset Boulevard to convert into their second campus.