Equip Studio Equip Studio
LET'S CONNECT!

Class

  • Francis Marion University – Honors Learning Center

    Concept, Institutional, New Construction, Selected
  • Peoples Church

    Built, Churches, Featured, Interior Design, Master Planning, New Construction, Renovation
  • NewSpring Church – Eastlan Campus

    Churches, Concept, Featured, Interior Design, Master Planning, New Construction, Renovation
  • The Bridge Church – Spring Hill Campus

    Built, Churches, New Construction, Renovation, Standard

    In 2018, The Bridge Church chose to expand their facility at their main Spring Hill campus to accommodate exponential growth.

  • Concord Baptist Church

    Churches, Design, Interior Design, Master Planning, New Construction, Renovation, Showcased

    Equip Studio began working with Concord Baptist Church in 2018 to develop a long-term masterplan for their Anderson, SC campus. We were presented with several design problems that required a comprehensive assessment of how the sprawling campus was being utilized which resulted in a multi-staged solution that ultimately sets the stage for a "complete" masterplan for their property.

  • Reverb Church – World Golf Village

    Adaptive Reuse, Built, Churches, Featured, Interior Design, Renovation

    Reverb Church in St. Augustine, FL is dedicated to exploring community outreach opportunities and was in need of a facility that would be open throughout the week to serve as a hub for the people around them.

  • Oaks Church

    Built, Churches, Interior Design, New Construction, Renovation, Showcased

    The Oaks Fellowship, was looking for a diagnostic evaluation and design solutions to their facility problems.

  • North Greenville University – Neves Hall

    Adaptive Reuse, Built, Commercial, Institutional, Interior Design, Renovation, Showcased

    The leadership of North Greenville University desired to consolidate their student services into one central location on campus. The provided solution required a complete renovation to Neves Hall, an existing administration building on campus that had previously served as a student dining hall.

  • Florence City Center Market

    Adaptive Reuse, Built, Commercial, Master Planning, New Construction, Selected

    The Florence City Center Market was designed with the City of Florence to bring a new energy and draw to an up and coming side of downtown. The market was built atop an existing warehouse pad leaving a portion of the existing building structure intact creating a unique and eclectic outdoor structure.

  • Athens Church – Green Space Project

    Adaptive Reuse, Built, Churches, Featured, Master Planning, New Construction, Renovation

    Athens Church has always focused primarily on serving families within the community of Athens, GA.

  • ←
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • →
CONNECT

hello@equipstudio.com

#EQUIPSTUDIO

GVL

245 North Main Street
Suite 200
Greenville, SC 29601

864.520.2086

FLO

101 Kuker Street
Florence, SC 29501

843.665.6646

  • Home
  • Work
  • Team
  • Culture
  • Connect
  • 2023 Template Sandbox
  • Connect
  • Culture
  • Home
  • Home
  • Logo Wall Test
  • Projects
  • Team
    • Brad Williams
    • Bruce Landis
    • JC Honeycutt
    • Join Our Team
      • Apply Now
    • Katherine Harland
    • Kelsey Murphy
    • Nicole Cash
    • Page Cross
    • Porter Covil
    • Sydney Parker
    • Amanda Christie
    • Emma Hanson
    • Hannah Black
    • Hope Lins
    • Leo Hernandez
    • Mady Duncan
    • Martin Duarte
    • Sam Childers
    • Sims Key
    • Zach Si
    • Sandy Gibbes
    • Jonathan Edens
    • Dwight Troyer
    • Stephen Troutman
    • Tanner Sharpe
    • Peter Shamblin
    • Alisha Coleman
    • Charlie Hall
    • Haley Baldwin
    • Jada McCutcheon
    • Morgan Reynolds
    • Madison Polk
    • Lauren Mahaffey
    • Josh Guertin
    • Daphne Noegel
    • Kendall Seay
  • Test – Join Our Team 2022
  • Test – Logo Wall Grid
  • Work
    • Market
      • Churches
      • Commercial
      • Healthcare
      • Hospitality