Churches
-

NewSpring Church – Eastlan Campus
50,000-100,000, Addition/Renovation, Children’s Ministry, Churches, Complete, Featured, Interior Design, Master Planning, New Construction, South Carolina -

The Bridge Church – Spring Hill Campus
50,000-100,000, Addition/Renovation, Children’s Ministry, Churches, Complete, New Construction, Standard, Student Ministry, TennesseeIn 2018, The Bridge Church chose to expand their facility at their main Spring Hill campus to accommodate exponential growth.
-

Concord Baptist Church
25,000-50,000, Addition/Renovation, Children’s Ministry, Churches, Interior Design, Master Planning, New Construction, Showcased, South Carolina, Under ConstructionEquip Studio began working with Concord Baptist Church in 2018 to develop a long-term masterplan for their Anderson, SC campus. We were presented with several design problems that required a comprehensive assessment of how the sprawling campus was being utilized which resulted in a multi-staged solution that ultimately sets the stage for a "complete" masterplan for their property.
-

Reverb Church – World Golf Village
Adaptive Reuse, Adaptive Reuse, Addition/Renovation, Children’s Ministry, Churches, Complete, Florida, Furniture, Furnishings, & Equipment, Interior Design, Showcased, Up to 5,000Reverb Church in St. Augustine, FL is dedicated to exploring community outreach opportunities and was in need of a facility that would be open throughout the week to serve as a hub for the people around them.
-

Oaks Church
50,000-100,000, Addition/Renovation, Children’s Ministry, Churches, Complete, Interior Design, K-12 Education, New Construction, Showcased, Student Ministry, TexasThe Oaks Fellowship, was looking for a diagnostic evaluation and design solutions to their facility problems.
-

Athens Church – Green Space Project
50,000-100,000, Adaptive Reuse, Addition/Renovation, Churches, Community Gathering, Complete, Georgia, Master Planning, New Construction, Recreation, ShowcasedAthens Church has always focused primarily on serving families within the community of Athens, GA.
-

National Community Church
50,000-100,000, Adaptive Reuse, Addition/Renovation, Children’s Ministry, Churches, Complete, Interior Design, Master Planning, Showcased, Washington, DCNational Community Church, led by Pastor Mark Batterson, partnered with Equip Studio to develop a design that conveyed their story as well as the story of our nation’s capital.
-

Netcast Church
5,000-25,000, Adaptive Reuse, Adaptive Reuse, Addition/Renovation, Children’s Ministry, Churches, Complete, Interior Design, Massachusetts, Master Planning, Restaurant, Showcased, Student MinistryNetcast Church, located near Boston, MA, decided to pursue a nontraditional route in regards to establishing their permanent church home.
-

Hope Point Church
5,000-25,000, Adaptive Reuse, Adaptive Reuse, Addition/Renovation, Children’s Ministry, Churches, Complete, Interior Design, Master Planning, Showcased, South Carolina, Student MinistryHope Point Church had been meeting as a mobile congregation in a local school for roughly 15 years in Spartanburg, SC. In order to provide ministry outreach to an under served community, the church acquired a former car dealership on Asheville Highway to convert into their new permanent church home.
-

Fellowship Church
5,000-25,000, Addition/Renovation, Churches, Complete, Connecticut, Interior Design, Master Planning, New Construction, Standard, Student MinistryFaced with the task of reorganizing Fellowship's site, Equip proposed demolishing an unused sanctuary to accommodate new parking and green spaces between the remaining buildings.